| |
Galactic
Make New Breakthrough in Surveillance System
------ electric power supervisory system case study
Electric
Power Co. needed to develop a video surveillance system, using
high-tech information technology, to further improve the management
and maintenance of electric power system, build a secure and
reliable modern power system. The video surveillance system
has about 300 cameras providing all-weather supervision, using
video server mode and 2CIF format. Data will be stored for
15 days. According to Electric Power company¡¯s needs and national
technology standards, Galactic developed the design based
on the following principles:
The Electric Power surveillance system adopted Galactic
VSTOR S316IN system for centralized data storage and processing.
VSTOR storage system is a high performance system independently
developed by Galactic, able to support multiple host channels.
S316IN's IP-SAN storage system has integrated dual hosts using
Intel 64-bit storage controller, supports up to 8GB high speed
memory, easily meets the needs of data processing for 300
cameras. Standard configuration has two 1000Mbps Ethernet
ports, supporting i-SCSI protocol, and can expand up to eight
Ethernet ports, to provide a bundled 8GB IP-SAN channel. It
also supports NAS protocol and provides file transfer service,
hence protects customer's investment to the maximum
extent. S316IN has 16 hot-plug SAS hard drive slots, with
SAS and SATA hard drive compatibility. With 1 TB SATA hard
drive, the maximum capacity of a single cabinet can reach
16 TB, and is expandable by connecting to expansion cabinet,
satisfying Shaanxi Electric Power's needs for large capacity
storage system.
Galactic doesn't just provide high performance storage
products, but also sets security standards; the team is very
experienced in the area of video surveillance systems. Galactic
has conducted thorough analysis of electric power industry's
needs for security and surveillance, and is taking advantage
of its experience in video network development and management
to provide professional security and superior level designs
as well as end-to-end solutions.
User evaluation: head of the Electric Power Co. Security Surveillance
Department participated in all phases of the project including
planning, designing, reviewing, implementation, and acceptance
test, and fully appreciates Galactic¡¯s professional design
and smooth execution. ¡°Product performance and services are
the main reason for choosing Galactic. I hope to continue
our cooperation with Galactic in the future.¡±
[- End -]
|
|